Plan the piping
installation from the Beam power unit to the inlet valves.
It's best to run the piping under the floor if possible.
In structures without basements, the piping may be run
through the attic or crawlspaces. In an existing two-
or three-story home, vacuum piping may be run to upper
levels through cold air ducts, through the back of closets
or under stairways, or beside a soil pipe. In new structures,
pipe can be run through wall studs before drywall is applied.
Be sure to plan where to locate the Beam power unit
usually in the garage or basement.
1/2" electric
drill (with right-angle head
if possible)
2 1/2" deep hole cut saw
steel tape measure
screw drivers (Phillips and
flat head)
wire stripper/cutter
hammer
2 1/2" masonry
bit
3/4" chisel
pocket knife
metal coat hangers
electrical tape
utility knife
miter box
hacksaw or small handsaw
pencil
flashlight
safety goggles
broom handle
stud finder
medium sandpaper
small mirror
Please check local building codes before installing as regulations vary across Canada.